Kobelco excavator parts specialist since 2007 — Guangzhou, China WhatsApp / WeChat: +86 181 4482 5432 · Tel: +86 20-32036036 · kobelco-parts@foxmail.com
Blog

Kobelco Parts for Landfill, Waste Transfer and Recycling Yards

Landfill and waste transfer work breaks excavators differently: wrap-around debris, abrasive dust, heat and leachate. What that does to filtration, cooling and undercarriage, and the numbers involved.

Blog / Kobelco Parts for Landfill, Waste Transfer a…
October 12, 2026 · Shenyue Kobelco Parts Team
Kobelco hydraulic return filter elements LS52V01006R210 and LS52V01006R200 photographed at the Shenyue warehouse in Guangzhou
Hydraulic return filter elements photographed in our Guangzhou warehouse, where 3,000+ part types are held on the shelf and 100,000+ part numbers are available to order.

Landfill and waste transfer work is not demolition and it is not quarry work, and parts buyers who plan for it as if it were one of those two end up with the wrong stock. The machine is not hitting anything hard, but it is working in abrasive dust, fibrous debris that wraps around anything rotating, heat that has nowhere to go, and in the worst sites leachate that attacks every seal and connector it reaches. Guangzhou Shenyue Machinery Technology Co., Ltd. stocks for this duty for customers who run waste contracts, and the pattern of what fails first is very consistent.

What this duty does to a machine

Fibrous material is the defining problem. Plastic film, fabric, wire and strapping wrap around axles, hoses and track frames, and they hold abrasive grit against surfaces that would otherwise wear slowly. That means undercarriage and hose wear here is not measured in hours the way it is in a quarry — it is measured in how often the operator gets out and clears the machine. The second problem is heat. A waste transfer shed is often enclosed and hot, the cooling pack blocks with light dust and fibre rather than heavy grit, and blocked fins raise hydraulic and engine temperature at exactly the time when airflow is lowest.

The third is chemistry. Where leachate is present it reaches connectors, cylinder rod seals and hose ends slowly enough that nobody notices until a machine will not start or a cylinder weeps.

Filtration is the first line of defence

On this duty the filter schedule stops being a cost line and becomes the reason a machine stays in service. Air, fuel and hydraulic filtration all take more load than the manual anticipates, and the practical rule is to inspect by restriction rather than by the calendar.

FilterWhy it takes extra load hereNumbers quoted in our records
Air filter assemblyLight dust and fibre stay airborne and reach the elementLE11P00011F1KG3; air filter set YN11P00034R100
Fuel filterDust ingress at the filler and condensation in the tankVH23304EV360
Water-fuel separatorCondensation is worse in an open, warm shedLG21P01003F2; separator YN21P01157F1
Engine oil filterShorter effective life under heavy idling cyclesLC11P00019R100; 2451U324-1D / VAME130968
Hydraulic return filterFibre carries fine grit into the tankLS52V01006R210 / LS52V01006R200

Cooling is the second line, and the cheapest one to fix

Radiator and oil cooler fins block with a mat of light material that does not blow out with compressed air unless it is loosened first. Machines on this duty earn their money back on a weekly wash-down schedule, and inspection is free — which is why the cooler should be the first thing checked when a machine on waste work starts running hot. Our records quote the cooler assembly as LQ05P00071F1 and the oil cooler as VA3433903100.

Shenyue tip: send photographs of the cooling pack and the filter elements you took out, not just the part numbers. Guangzhou Shenyue Machinery Technology Co., Ltd. can tell from the blockage pattern whether the machine needs a different filtration grade, a stricter wash-down interval, or simply the same elements more often — which is usually the honest answer.

Undercarriage, hoses and connectors

Debris wrapping around the track frame loads the idlers and rollers unevenly and, over time, damages the idler shaft and the bushings at the front end. Our records quote the idler shaft as VA32F2303402 and the arm bushing as LC12B02199P1, and both are wear items on this duty long before the track chain itself is finished. On the hose side, fibre holds grit against the cover and hides damage until a failure, so hoses are inspected by feel and by date rather than by sight — the numbers in our records include the LC05P00043S032 / LC05P00043S002C group and the YN52V01016R620 / YN52V01016R610 / YN52V01016R100 group.

Electrical connectors are the quiet failure. Leachate and wash-down water reach the connectors under the upper structure and behind the cab, and the result is intermittent faults that look like sensors failing. Water temperature sensor 2489U268F1 and hydraulic oil temperature sensor LS52S00046P1 are both commonly replaced on machines where the real problem was a corroded plug.

What a waste-duty kit should contain

A sensible kit for this duty is heavy on consumables and light on assemblies: a full filter set, a set of undercarriage front-end parts, a spare hose of each size in use, and one of each of the sensors most likely to be blamed for an intermittent fault. Assemblies — pump, travel motor, swing motor — are better bought on measured condition, because on waste work they usually outlast the consumables by a wide margin.

The filter and consumable range sits on the filters and lubricants page, the front-end wear parts on the undercarriage and cylinders page, and the comparison with a harder-impact duty is set out in our demolition and scrap handling guide. If the machine is also working cold or wet seasons, the pattern for multi-brand fleets is covered by our export brand at corbayparts.com. Guangzhou Shenyue Machinery Technology Co., Ltd. keeps 3,000+ part types on the shelf for this duty and 100,000+ part numbers available to order.

Frequently Asked Questions

Which parts fail first on a Kobelco working in a landfill?

Filtration, cooling and the undercarriage front end, in that order. Light dust and fibrous material load the air and hydraulic filters continuously, block the cooling pack fins so the machine runs hot, and wrap around the track frame where they hold grit against idlers, shafts and bushings. Major hydraulic assemblies normally outlast all of those on this duty.

How often should filters be changed on waste transfer work?

By measured restriction rather than by a fixed hour count, because dust load varies enormously between sites and between wet and dry seasons. Our records quote the hydraulic return filter as LS52V01006R210 / LS52V01006R200, the air filter assembly as LE11P00011F1KG3 and the fuel filter as VH23304EV360 — the interval is set by what the elements look like when they come out.

Why does my Kobelco run hot in a waste transfer shed but not in a quarry?

Because the blockage is different. In a shed the cooling pack fills with light dust and fibre that does not blow out with compressed air unless it is loosened first, and the shed itself is often enclosed and hot. Cleaning the fins is free, which is why it is checked before the thermostat, the water pump — quoted in our records as VH16100E0770 — or the cooler assembly LQ05P00071F1 is suspected.

What should a waste-duty parts kit contain?

A full filter set, front-end undercarriage wear parts such as the idler shaft VA32F2303402 and arm bushing LC12B02199P1, one spare hose of each size in use, and one of each sensor most often blamed for an intermittent electrical fault. Guangzhou Shenyue Machinery Technology Co., Ltd. declares every line genuine, OEM or aftermarket so the kit can be assembled to a known budget.

Need the parts this article talks about?

Send your part numbers and a photo of the nameplate — real photos and pricing come back with the quote.

Start an Inquiry